How it works

Seismos-CONNECT™ is a plug and play tool that leverages acoustics to accurately measure the perf tunnel efficiency of each stage prior to pumping. The tool can be utilized on any well and serves as a seamless addition to any completion operation.



Actionable data:



  • Alerts operators when stages have poor perforation efficiency
  • Enables timely mitigation action before pumping starts
  • Eliminates NPT 
Wellbore Perforation efficiency analysis

How to use

Seismos-CONNECT dashboard presents perforation efficiency of each stage prior to pumping

When it comes to mitigating the consequences of poor perf to reservoir coupling, timing is everything. Seismos-CONNECT™ measures the perf tunnel efficiency of each stage before pumping and allows operators to make educated decisions rather than uninformed ad hoc adjustments in an attempt to alleviate abnormal pressure behaviors.



No operational downtime/NPT

Identify difficult to treat stages that typically lead to incremental NPT

Mitigate abnormal pressure patterns 

Avoid irreversible damages to the fracture system before it starts by mitigating poor perf to reservoir coupling

Case studies

Request Presentation

CONNECT page